< img height="1" width="1" style="display:none;" alt="" src="https://ct.pinterest.com/v3/?event=init&tid=2613566404998&pd[em]=&noscript=1" /> Aluminum Foil Vietnam
Casaes
Position :
Home > Cases

Aluminum Foil Vietnam

Release Tme: 2025-02-19
Read:
Share:

Case Study: How Tran Quang Minh Found Reliable Aluminum Foil Solutions in Vietnam


Background


Tran Quang Minh, a procurement manager at a food packaging factory in Ho Chi Minh City, faced mounting pressure in 2024. His existing aluminum foil supplier had repeatedly delayed deliveries, causing production bottlenecks. Additionally, rising material costs eroded profit margins, while rigid product specifications limited innovation for his clients in Europe. Minh needed a supplier that combined affordability, flexibility, and reliability a combination hard to find locally.

The Search


While scouring B2B platforms like Alibaba, Minh discovered Guangdong MetalTech, a Chinese manufacturer specializing in customized aluminum foil. Our company profile highlighted two advantages: 20% lower pricing than Southeast Asian competitors (backed by China’s scaled production) and tailored solutions—from thickness adjustments to branded packaging designs. Intrigued, Minh sent an inquiry via our multilingual portal, emphasizing his need for “Made in Vietnam”-labeled foil to bypass EU tariffs.

Why Choose Us?
 

  1. Cost-Efficiency Without Compromise
    We provided Minh with samples meeting ASTM standards at 2,850/ton astark contrast to his local supplier’s 2,850/ton—astark contrast to his local supplier’s 3,400/ton quote. By leveraging China’s integrated supply chain, we eliminated intermediaries, passing savings directly to him.

  2. Customization as a Standard
    Minh’s European clients required eco-certified foil with embossed logos. Within 10 days, we engineered a prototype using recycled aluminum and laser-engraving tech, aligning with both EU sustainability mandates and brand aesthetics.

  3. Faster Production
    As premier alu foil manufacturer, we have large production ability to finish the production in a short time. This could improve our goods delivery efficiency to clients.

  4. Transparent Logistics
    We pre-negotiated shipping routes from Guangdong to Hai Phong Port, cutting lead times from 6 weeks to 18 days. Real-time tracking via our ERP system allowed Minh to synchronize production schedules seamlessly.

Outcome

Within 3 months, Minh transitioned 70% of his orders to us. His factory reduced material costs by $120,000 annually while securing new clients in France and Germany. “You’re not just a vendor,” he remarked, “you’re a partner who solves problems before they arise.”

Looking Ahead

Lauvacs continues to support Minh’s expansion into compostable foil proof that when price, customization, and agility converge, borders become irrelevant.


TAGS:
Welcome Your Inquiry
we will reply you promptly after receiving the information.

About
Welcome Your Inquiry